6th Street - Phase 1

Big changes are coming to CRHA’s Sixth Street neighborhood. The existing housing was built in 1981 and it was due for a refresh after years of heavy use. 

CRHA and partners began planning with residents in 2021. There will be two phases of construction. The first replaces 6 units with a 47 unit building featuring structured parking, loads of indoor and outdoor community space and a UVA Medical Clinic.

Construction of Phase 1 will began in 2025 and is expected to last 18 months.

Second phase planning is underway. CRHA is anticipating a mixture of townhomes and a small walk up apartment building. CRHA will be seeking funding in 2026 for this second phase.

 

7-2025
Demolition of Existing Structure

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Erat enim res aperta. Ne discipulum abducam, times. Primum quid tu dicis breve? An haec ab eo non dicuntur?

12-2026
Groundwork and Foundation

Aliter homines, aliter philosophos loqui putas oportere? Sin aliud quid voles, postea. Mihi enim satis est, ipsis non satis. Negat enim summo bono afferre incrementum diem. Quod ea non occurrentia fingunt, vincunt Aristonem.

1-2026

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

2-2026

Add Description Here

3-2026
Add Title Here

Add Description Here

4-2026
Add Title Here

Add Description Here

5-2026
Add Title Here

Add Description Here

6-2026
Add Title Here

Add Description Here

7-2026
Add Title Here

Add Description Here

Final Renders